This section considers the east side of the banking built for the Main reed beds. I wish the designers had thought up better names that higher reed bed and Reed bed. I keep calling higher reed bed, upper reed bed. I've decided to call Reed bed, Main reed beds. After a long detour to get around a naughty little channel running along the west side of the Main reed bed banking, I walked up said banking and got more and more confused. The problem is, there should be two lines of banking, with a culvert/channel running between them. There is only one stretch of banking and, whilst the overall shape is correct, it and a channel that is already there, do not conform to the plans I have - unless said plans have changed. Anyway, Inert have continued to fettle this banking and have even started to build the banking between the Main reed bed and Manor lake. Comments are closed.
|
AuthorA polite notice first: All photographs on this blog are owned by me and subject to copyright. Archives
November 2025
Categories |