A brief warm spell envelopes south England. Possibility of more to come at week's end.
Dodging showers, I ventured to Manor farm. An idle digger, north of the Bailey bridge, heralded what could be a very, very slow build of the north bridle path. I realised the path was being built, as I spied a maxi dumper truck driving very slowly southward towards the yellow bridge. Each round trip of the maxi dumper truck takes between 15 and 20 minutes; if not longer. The truck does not carry much ballast. I think the heavy earth movers carry three or four times as much. Hence, we are in for a very long build process. I might pop down this weekend. Not sure. Another cold night is forecast for Friday/Saturday. Comments are closed.
|
AuthorA polite notice first: All photographs on this blog are owned by me and subject to copyright. Archives
November 2025
Categories |